To main content

Increased utilisation of the Nordic power transmission systems

"Increased utilization of the Nordic power transmission system”, was a project that SINTEF Energy Research carried out together with Nordic universities and the Nordic transmission system operators Elkraft System, Fingrid, Svenska kraftnät and Statnett. The main objective in this project was to develop methods, models and control solutions that will contribute to enable increased utilization of the existing power grid. The project had three main activities, and below are some examples of objectives and results within each of the activities.


Activity 1

Sub-project Type of doc. Name and reference of document Date/year
1.1. “FlexLast” Project Memo Nordgård,Uhlen, Notgevic: ”Flexlast - Prototyp for pålitelighetsbasert lastgrensesetting”. Arbeidsnotat AN 01.12.91, SINTEF Energiforskning. Dec. 2001
Project Memo Nordgård, Feilberg, Uhlen: Beskrivelse av prototypmodeller for håndtering av spesia-lreguleringer og forventede avbruddskostnader. Arbeidsnotat AN 02.12.97, SINTEF Energiforskning. Dec. 2002
  - Notatet til Gerd S. -
1.2. ”Security assessment” - - -

Activity 2

 
2.1. ”System models - SvK” Technical Report Uhlen, Warland: ”System models for market and network operation – Part 1. Technical report TR F???? October 2003
2.2. ”Area price det. based on network equivalents” Project memo Solem: “Områdeprisberegning i spotmarkedet. Rammebetingelser, model, alternativer, muligheter og begrensninger”. Project memo, AN 02.12.74. Nov. 2002
Technical Report Norheim, Warland, Solem, Uhlen, Grande: Area price determination based on network equivalents. Teknisk rapport TR F5746, SINTEF Energiforskning.

Jan. 2003


Activity 3

3.1. ”Stability assessments – Statnett” Memo Time, Lysheim, Uhlen: Modellutvikling og forbedring av stabilitet i Haslesnittet. Memo, Dok.id. 219086, Statnett. June 2001
Project Memo Gjøsæter, Uhlen: Enkle rutiner for innstilling av parametere for spenningsregulatormodeller. Project memo, AN 01.12.23, SINTEF Energiforskning. June 2001
Technical Report Uhlen, Pálsson: Systemutnyttelse – Kriterier og metodikk for fastsettelse av stabilitetsgrenser. Teknisk rapport TR F5705, SINTEF Energiforskning. May 2002
3.2. ”Stability assessments – Fingrid” Technical Report Uhlen, Elenius, Gjøsæter: Power system stability assessments – Application of modal analysis to the Finnish transmission system. Teknisk rapport TR F5615, SINTEF Energiforskning, Februar 2002. Feb. 2002
Technical Report Uhlen, Elenius, Norheim: Power system stability assessments – Part 2: Controller design. Teknisk rapport TR FF5818, SINTEF Energiforskning, April 2003. April 2003
3.3. “System operation – Elkraft S.” Technical Report Palsson: System operation and control with increasing integration of wind power and distributed generation – Part 1: Wind farm modeling. Technical report TR F5824 May 2003
4. “Project coordination” - Annual report to NFR Dec. 2001
- Annual report to NFR Dec. 2002
- “EMBa Nyhetsmail” June 2003
       

Papers

 


MODELS AND PROTOTYPES:

Sub-project Model / Prototype Date/year
1.1 “FlexLast” 2001/2002
2.1 “Equivalent network and dynamic models” 2003-
2.2 “Model for area price determination” 2002 -

 


Partners:

  • The Research Council of Norway (NFR)
  • Statnett SF
  • Svenska Kraftnät
  • Fingrid
  • Elkraft System
  • Nordel
  • Nordpool



Key facts

Project duration

2001 - 2006

Explore research areas