![Operational security and control](/contentassets/4dbaff37dd564b9a9d0cd94e0f4ecfef/driftssikkerhetsplanlegging-og-kontroll_uk.jpg?width=560&height=315&mode=crop&scale=both&quality=70)
Operational security and control
When the proposed HVDC links from southern Norway to the Netherlands and Germany start operation, the total exchange capacity to the Continent will increase to about 2800 MW from the four HVDC terminals located within a geographical distance of...