Abstract
This paper evaluates various aspects of flexibility in power systems worldwide within the multi-country study framework of IEA Wind Task 25, including grid components and actions which have been favoured for enhancing flexibility in different areas/countries/regions, and how TSOs/ISOs/ utilities intend to manage variable generation in their operating strategies. One methodology to evaluate the diversity of flexibility sources is a "flexibility chart", which can illustrate several flexibility parameters (e.g. hydro, CCGT, CHP, interconnection) in a polygonal radar (spider) chart.