To main content

eTransport: Investment planning in energy supply systems with multiple energy carriers

Abstract

The need for local energy planning is not reduced after liberalization. Both integrated energy companies and local governments have to consider alternative solutions across traditional supply and demand sectors and make plans for the total integrated energy infrastructure. This situation has created a need for new improved methodologies and tools for system planning and operation that include multiple energy carriers and sufficient topological details. In this paper, a novel optimisation model 'eTransport' is presented that takes into account both the topology of multiple energy infrastructures and the technical and economic properties of different investment alternatives. The model minimises total energy system cost (investments, operation and emissions) of meeting predefined energy demands of electricity, gas, space heating and tap water heating within a geographical area over a given planning horizon, including alternative supply infrastructures for multiple energy carriers. The model employs a nested optimisation, calculating both the optimal diurnal operation of the energy system and the optimal expansion plan typically 20-30 years into the future. The model is tested on a number of real case studies, and a full graphical user interface has been implemented. A sample case study is included to demonstrate the use of the model. (c) 2007 Elsevier Ltd. All rights reserved

Category

Academic article

Language

English

Author(s)

Affiliation

  • SINTEF Energy Research / Energisystemer

Year

2007

Published in

Energy

ISSN

0360-5442

Publisher

Elsevier

Volume

32

Issue

9

Page(s)

1676 - 1689

View this publication at Cristin