To main content

Cost-Benefit Analysis of Battery Energy Storage in Electric Power Grids: Research and Practices

Abstract

This paper provides an overview of methods for including Battery Energy Storage Systems (BESS) into electric power grid planning. The general approach to grid planning is the same with and without BESS, but when BESS is included as an alternative, other methods are necessary, which adds significant complexity to the planning problem. Although recent research literature proposes a wide range of methods and models for Cost-Benefit Analysis (CBA) of BESS for grid applications, these are to a little extent applied in practice. For the research-based methods to be suitable for grid planning, they should handle timing of installations as well as sizing and siting of BESS. Moreover, they must capture long-term developments in load and generation. Finally, the CBA methods need realistic modelling of the operational benefits of BESS, taking into account multi-period AC power flow, battery degradation, and utilization for multiple grid services.
Keywords: Battery storage
,
cost-benefit analysis
,
electric power grid
,
power system planning
Read publication

Category

Academic chapter/article/Conference paper

Client

  • Research Council of Norway (RCN) / 257626

Language

English

Author(s)

  • Iver Bakken Sperstad
  • Maren Istad
  • Hanne Sæle
  • Magnus Korpås
  • Irina Oleinikova
  • Seppo Hänninen
  • Sergio Motta
  • Konstantina Panagiotou
  • Christina Papadimitriou
  • Venizelos Efthymiou
  • Chresten Træholt
  • Mattia Marinelli

Affiliation

  • SINTEF Energy Research / Energisystemer
  • Norwegian University of Science and Technology
  • VTT Technical Research Centre of Finland
  • Cyprus
  • Technical University of Denmark

Year

2020

Publisher

IEEE (Institute of Electrical and Electronics Engineers)

Book

2020 IEEE PES Innovative Smart Grid Technologies Europe - ISGT-Europe

ISBN

978-1-7281-7100-5

Page(s)

314 - 318

View this publication at Cristin