Abstract
This report includes the plans for manufacturing and qualification testing of the project demonstrators including water jet impeller, pump impeller and propeller blade. The manufacturing and testing procedures for each demonstrator were planned based on the requirements and selected class society guidance in the deliverable D2-1.