To main content

New Developments of Direct Electrical Heating for Flow Assurance

Abstract

The operating experiences for more than 10 years of hydrate and wax
management of pipelines by direct electrical heating have proved high
reliability, robustness and operating simplicity. The system is in use for
pipelines ranging up to 40 km length and water depths down to approx.
500 m. As the oil and gas industry is moving towards deeper water and
longer transport distances, electrical heating becomes even more
attractive. In deeper waters plug removal by depressurization may be
impossible. Cost and weight are important issues when DEH are being
adapted for deep water installations. In general increasing the system
power frequency reduces the size and weight of electrical equipment
and higher frequencies are now being addressed in the new
development programme of DEH for deep water fields.

Category

Academic article

Language

English

Author(s)

Affiliation

  • SINTEF Energy Research / Elkraftteknologi
  • Nexans Norway AS

Year

2012

Published in

ISOPE - International Offshore and Polar Engineering Conference. Proceedings

ISSN

1098-6189

Publisher

International Society of Offshore & Polar Engineers

Page(s)

238 - 243

View this publication at Cristin