The AEM-HUB is a cluster of three EU projects working to improve anion exchange membrane water electrolysers (AEMEL) for green hydrogen production.
Objectives
Objectives of the cluster:
- To develop standardised test protocols and terminology for AEM electrolysis research
- To develop innovative AEMs with high performances
- To optimise non-PGM electrocatalysts for AEM WE systems
- To demonstrate 2 kW AEM WE stack prototypes operating at high pressure
Impact
The AEM-HUB projects will push the development of AEM water electrolysis systems towards lower costs, higher efficiency, and increased sustainability. This will pave the way for larger-scale implementation of the technology and make Europe a global leader in green hydrogen production.
![](/contentassets/8236446ff2e143438b8fed186d65d5f0/aemhub_logo-red.png?width=1080&height=608&mode=crop&scale=both&quality=80)
Members
The AEM-HUB gathers three projects financed by the Fuel Cells and Hydrogen Joint Undertaking (FCH JU) with the common goal of advancing the AEMEL technology.
![](/contentassets/5a696e3980a245bea9d347f905a0abea/anione-web.png?width=1080&height=608&mode=crop&scale=both&quality=80)
ANOINE
The aim of the ANIONE project is to validate a 2 kW AEM electrolyser with a hydrogen production rate of approximately 0.4 Nm3/h. To achieve this, innovative reinforced anion exchange membranes will be developed in conjunction with non-critical raw material electrocatalysts with high surface areas and membrane-electrode assemblies.
![](/contentassets/a40b1b9db7684b15b56bf59bec377358/channels-web.png?width=1080&height=608&mode=crop&scale=both&quality=80)
CHANNEL
The CHANNEL project aims to build a cost-efficient 2 kW AEM water electrolyser able to operate at differential pressure, as well as under dynamic operation, optimal for producing high quality, low-cost green hydrogen from renewable energy sources.
![](/contentassets/449b5503845344f89dedece39a69cac1/newley-web.png?width=1080&height=608&mode=crop&scale=both&quality=80)
NEWELY
The NEWELY project aims to build and test a 2 kW 5-cell AEMWE stack prototype based on hydraulic compression with novel components characterised by superior performance and stability.