IKU Stratigraphic Drilling Projects 1982 - 1993
Slimhole logging was performed by BPB in most of the coreholes (before and/or after pulling the drill string). The table shows the mnemonics of all wireline logs available from the coreholes in digital form (ASCII / Excel).
TOP(mSB)
BTM(mSB)
0.10.90.70.70.10.10.10.10.10.10.10.11.13.9-4.50.10.10.10.10.10.10.30.20.80.10.60.10.10.10.10.10.10.30.70.10.20.10.1
151201.187.6100.4172130.1134.2104.6134.2181.375.740.2560.7282.4235.4189.2198.2198.2169.9179190.8130.1274.1298.7191236.4157200.5199.9151.9151.9159.4182.1103.619822312068.6
Published February 26, 2008