Projects
Contact person, projects
- ReHydro (2024 - 2028)
- ReAdapt - Adapting hydropower to future climate extremes (2023 - 2027)
- HydroConnect (2021 - 2024)
- FITHydro (2016 - 2020)
- SNOWHOW (2015 - 2017)
- FutureHydro (2012 - 2015)
- Improved development and management of energy and water resources - EcoManage (2012 - 2015)
- Sustainable Grid Development – SusGrid (2011 - 2014)
- CEDREN - Centre for Environmental Design of Renewable Energy (2009 - 2017)
- Effects of rapid and frequent flow changes – EnviPEAK (2009 - 2013)
Expertise
Publications
- Peculiarities of the run-off-river hydropower potential in Romania
- Power of Flexibility - Facilitating the Energy Transition with Hybrid Hydropower Solutions : Technical Report
- Downstream fish passage evaluation using barotrauma detection sensors at the Kongsvinger and Funnefoss power plants Read publication
- Kunnskapsgrunnlag for vurdering av vannkraft i vernede vassdrag – Verdalsvassdraget som pilot
- Power system impacts of new environmental constraints for hydropower in Norway
- Sammendragsrapport – Samlet innvirkning på det norske kraftsystemet av nye miljørestriksjoner for vannkraften
- Potensial for opprusting og utvidelse av vannkraft med miljødesign
- Mapping Sites for Retrofitting non-Powered Dams in Romania as Renewable Power Sources
- Potensial for opprusting og utvidelse av vannkraft med miljødesign- PotOUt
- Energy Flexibility-Environmental Outcomes Tradeoffs Workshop Report and Research Roadmap
Other
- Utvidet miljødesign: Miljødesign i regulerte vassdrag tar nye veier
- Vi henger etter med tiltak mot klimaendringene
- Mener ny teknologi kan åpne verna vassdrag for kraftproduksjon
- Cross-disciplinary approach to restoration of a hydropower regulated river in Norway
- Vernede vassdrag i spill
- Utbygging i Etna?
- Extended environmental design
- Anbefalinger for metodevalg i miljødesign – oppsummering fra demovassdrag Nea
- Svar til Krogh
- Svr til Krogh