To main content

Requirements for future control room and visualization features in the web-of-cells framework defined in the Electra project

Abstract

This paper outlines an overview of the general requirements for the control rooms of the future power systems (2030+).
The roles and activities in the future control centres will evolve with respect to the switching, dispatching and restoration functions currently active. The control centre operators will supervise on the power system and intervene - when necessary - thanks to the maturation and wide scale deployment of flexible controls.
For the identification of control room requirements, general trends in power system evolution are considered and mainly the outcomes of the ELECTRA IRP project, that proposes a new Web-of-Cell (WoC) power system control architecture. Dedicated visualization features are proposed, aimed to support the control room operators activities in a WoC oriented approach. Furthermore, the work takes into account the point of view of network operators about future control rooms and feedback about the proposed visualization features, collected by means of interviews and questionnaires.
Read publication

Category

Academic chapter/article/Conference paper

Client

  • EC/FP7 / 609687

Language

English

Author(s)

  • Carlo Tornelli
  • Roberto Zuelli
  • Mattia Marinelli
  • Andrei Morch
  • Laurence Cornez

Affiliation

  • Italy
  • Technical University of Denmark
  • SINTEF Energy Research / Energisystemer
  • France

Year

2017

Publisher

IET Digital Library

Book

24th International Conference and Exhibition on Electricity Distribution : CIRED 2017 - Proceedings

Issue

2017

ISBN

978-1-78561-484-2

View this publication at Cristin